Post-demolition of the old flight shackDigging the foundationFoundation preparationsPouring the foundation concreteTOC foundationRoof trusses arrive on siteFoundation from aboveFirst floor sheathing goes upFirst floor walls are upSecond floor walls and sheathing go upBuilding the roofInside the maintenance baySouth gambrel end2nd floorWest faceOps center framingNorth and east facesNorth faceEast faceWindows and insulation installed (west)Windows and insulation installed (east)TOC next to glidersFirst floor ready for concreteOps center framingConcrete poured on first floorSiding installation underway