Training and Operations Center (TOC) Renderings TOC in the summer TOC in the winter Plans Attachment-B-Elevations-and-Floor-Plans-230520Download Gallery Post-demolition of the old flight shack Digging the foundation Foundation preparations Pouring the foundation concrete TOC foundation Roof trusses arrive on site Foundation from above First floor sheathing goes up First floor walls are up Second floor walls and sheathing go up Building the roof Inside the maintenance bay South gambrel end 2nd floor West face Ops center framing North and east faces North face East face Windows and insulation installed (east) Windows and insulation installed (west)