Great progress is being made as the Training and Operations Center takes shape. Roof trusses are next and we are still tracking for a Spring ribbon cutting.
Stay tuned for more updates as we continue to build for the future. We can’t wait to welcome you to our new center soon!
In the meantime, help the dream take flight with your tax-deductible donation.
![first floor walls go up](https://soarfranconia.org/wp-content/uploads/2024/01/1st-Floor-Walls-go-up-Large-1024x768.jpeg)
1st floor walls go up.
![first floor walls are a wrap](https://soarfranconia.org/wp-content/uploads/2024/01/1st-Floor-Its-a-wrap-Large-1024x768.jpeg)
1st floor walls are a wrap!
![second floor walls go up](https://soarfranconia.org/wp-content/uploads/2024/01/2nd-Story-Walls-go-up-Large-1024x768.jpeg)
2nd story walls go up.
![2nd story](https://soarfranconia.org/wp-content/uploads/2024/01/2nd-Story-Large-1024x768.jpeg)
2nd story.